BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CMG NASC - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:CMG NASC
X-ORIGINAL-URL:https://nascsolutions.org
X-WR-CALDESC:Events for CMG NASC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260922T073000
DTEND;TZID=America/New_York:20260922T160000
DTSTAMP:20260920T124228
CREATED:20260901T183900Z
LAST-MODIFIED:20260918T192429Z
UID:15136-1790062200-1790092800@nascsolutions.org
SUMMARY:Navy Collaborative Combat Aircraft Increment 1 Prototype Project Industry Day - Postponed
DESCRIPTION:The Naval Air Systems Command (NAVAIR)\, on behalf of the Future Advanced Capability Program Office (PMA-228)\, will host an in-person Industry Day for the Navy Collaborative Combat Aircraft (CCA) Increment 1 Prototype Project. \n			\n				\n				\n				\n				\n				PROJECT OVERVIEW\nIn alignment with the Chief of Naval Operations (CNO) strategic guidance to deliver affordable\, lethal mass to the fleet\, the Navy is initiating the CCA Increment 1 prototype development effort to reduce risk and accelerate capability delivery of a highly capable\, autonomous platform optimized for operations from Gerald R. Ford-class and Nimitz-class Nuclear Aircraft Carriers (CVN). \nA critical capability gap exists within the Carrier Air Wing’s (CVW) ability to independently provide the capacity and organic lethal mass needed to gain sea control\, impose sea denial\, and project power\, particularly when operating in Highly Contested Environments (HCE). Manned fighter aircraft face extreme survivability risks in these environments\, while the high cost of replacing manned platforms limits the Joint Force’s capacity to absorb operational losses. \nTo address this gap\, the Navy requires an affordable\, highly capable\, risk-tolerant\, weaponized\, extended-range autonomous Unmanned Aircraft System that can seamlessly deploy from and recover to CVNs\, increasing Carrier Strike Group (CSG) capacity and extending CVW operational reach. \n \nThe Prototyping Challenge\nThis prototyping effort will evaluate autonomous platforms with extended range and payload capacity while minimizing carrier deck footprint and integrating directly with established CVN infrastructure. The effort establishes a path to augment 4th and 5th generation aircraft survivability\, lethality\, and capacity through collaborative Manned-Unmanned Teaming (MUM-T). \nThe Navy’s objective is to develop and evaluate prototype air vehicles capable of achieving shore-based carrier certification requirements within three (3) years or less from agreement award\, permitting full carrier qualification and eventual deployment. \nThis Industry Day will provide additional context on Naval Aviation’s vision and the planned prototyping effort while fostering collaboration among major primes\, small businesses\, and non-traditional companies to rapidly address identified capability gaps. \n \nWhy Attend?\nThis Industry Day provides prime contractors\, aerospace systems integrators\, subsystem vendors\, and non-traditional defense software developers an opportunity to: \n\nUnderstand the Navy’s CCA Vision: Engage with PMA-228 program managers and technical leads to better understand the carrier-compliant CCA roadmap.\nReview Technical Specifications Early: Gain insight into critical operational and hardware boundaries associated with the upcoming Increment 1 prototype.\nFacilitate Strategic Partnerships: Connect with potential teammates across software autonomy\, hardware manufacturing\, and weapon integration disciplines.\nProvide Industry Insight: Offer feedback regarding the feasibility of the three-year shore-based certification timeline and the proposed acquisition strategy.\n\n \nEVENT DETAILS\nTuesday\, September 22\, 20267:30 AM – 4:00 PM ETIn-Person \nUniversity System of Maryland at Southern Maryland (USMSM)44219 Airport RoadCalifornia\, MD 20619 \nSecurity Level: Briefings will be held at the Controlled Unclassified Information (CUI) level. Classified information will not be discussed during the main event. \nAttendance is restricted to Government-approved participants. \nAttendance Limit: Due to strict venue capacity\, participation is limited to a maximum of three (3) personnel per industry partner. \n \nTENTATIVE AGENDA\n7:30 AM – 8:00 AM | Registration\, Security Check-In & Morning Coffee8:00 AM – 8:45 AM | Welcome\, PMA-228 Leadership Opening Remarks & CMG Overview8:45 AM – 12:00 PM | Session I: Navy CCA Program Overview & CONOPS (CUI Briefings)12:00 PM – 1:00 PM | Networking Lunch & Industry Collaboration SessionLunch provided1:00 PM – 3:30 PM | Session II: Technical Deep Dive – CVN Integration\, Airworthiness & Digital Ecosystems (CUI Briefings)3:30 PM – 4:00 PM | Open Q&A & Closing Remarks \n  \nREGISTRATION & REQUIRED ACTIONS\nAll attendees must be pre-registered and approved. Walk-ins will not be permitted. \nAfter submitting the participation request form below\, please complete the following steps: \n\nSubmit your Participation Request using the form below no later than September 11\, 2026.\nDownload\, complete\, and sign the CUI NDA.\nEmail the completed NDA to rwp@cmgnetworks.org for Industry Day approval.\nRequest the CUI and/or Classified Technical Annex\, if applicable\, by following the security and submission instructions provided in the Full Industry Day Announcement.\nReview the RFI and submit feedback in accordance with the instructions provided on SAM.gov.\n\n📄 DOWNLOAD CUI NDA \n📄 DOWNLOAD FULL INDUSTRY DAY ANNOUNCEMENT \nThe full announcement includes additional information regarding the prototyping challenge\, CCA Increment 1 technical parameters\, CUI and Classified Technical Annex access requirements\, and security procedures. \nRegistration for this event is now closed.
URL:https://nascsolutions.org/event/navy-collaborative-combat-aircraft-increment-1-prototype-project-industry-day/
CATEGORIES:Industry Days
END:VEVENT
END:VCALENDAR